Leading Online Architectural Design Platform
Get Free Quotes Within Minutes
Width
Depth
Plot Area
Floors
Total builtup area
Building Type
Building Category
Style
Cost
Estimated cost of construction
1 BHK
2 BHK
Office Area
Shop
Lift
This 40x80 house plan has a total built-up area of 16,000 sq ft across 5 storeys, on a 3,200 sq ft plot.
Yes, this 40x80 house plan is drawn for a south facing plot and is aligned with Vastu principles, with proper ventilation and natural light in every room.
The estimated construction cost for this 40x80 house plan is Rs 2.7 crore to Rs 3.4 crore for 16,000 sq ft of built-up area (Rs 1,700 to Rs 2,100 per sq ft, excluding land).
Yes, you can request up to two modifications to adjust room sizes or layout according to your preferences.
This house plan is designed for a plot 40 ft wide and 80 ft deep, a plot area of 3,200 sq ft.
house design
5 marla house design
engineering house design
external house design
elevation design work
5 marla house front elevation designs
elevation design download
elevation design and consulting
front elevation design 5 marla
40x80 House Plan
5 Storey House Plan
5 Storey Residential Design
40x80 Plot House Plan
40x80 Modern House Plan
House Plan for 40x80 Plot
Read More Read Less
Happy Customer
In-House Team
Cities Covered
Project Traceability
This Floor plan can be modified as per requirement for change in space elements like doors, windows and Room size etc taking into consideration technical aspects.
Detail drawings can be purchased Like Door- Window, Staircase, Structure, Electrical & Plumbing etc for which is mandatory for any construction to be followed onsite
CAD file of floor plan can be purchased with complete dimension and furniture layout, which can be modified by any Engineer or Architect for further changes
| Item | From | To |
|---|---|---|
| Mason (मिस्त्री) | ₹ 107975 | ₹ 142527 |
| Shuttering Carpenter | ₹ 72932 | ₹ 96280 |
| Painter | ₹ 7131 | ₹ 9414 |
| Labour | ₹ 204967 | ₹ 1270556 |
| Blacksmith | ₹ 19955 | ₹ 26341 |
| Total | ₹ 00000 | ₹ 00000 |
| Item | From | To |
|---|---|---|
| Earth Work & Excavation | ₹ 22800 | ₹ 28956 |
| Cement Bags | ₹ 133153 | ₹ 152328 |
| Sands | ₹ 231623 | ₹ 280264 |
| Aggregates/Gravels | ₹ 7118 | ₹ 122663 |
| Steel | ₹ 131851 | ₹ 159539 |
| Paints | ₹ 69000 | ₹ 97704 |
| Flooring | ₹ 94875 | ₹ 142313 |
| Granite | ₹ 92000 | ₹ 165600 |
| Glazed tiles | ₹ 57600 | ₹ 97344 |
| Doors | ₹ 346950 | ₹ 487118 |
| Plumbing | ₹ 110857 | ₹ 152429 |
| Electrical | ₹ 94875 | ₹ 123148 |
| Total | ₹ 00000 | ₹ 00000 |
Copyrights © 2026 makemyhouse.com, Mason's Mark Pvt. Ltd.
Venture All Rights Reserved.
Design & Developed by HUMUJ Technology and Consulting.
Click here to consult with us