Leading Online Architectural Design Platform
Get Free Quotes Within Minutes
Width
Depth
Plot Area
Floors
Total builtup area
Building Type
Building Category
Style
Cost
Estimated cost of construction
1 BHK
3 BHK
Verandah
Septic Tank
This 43x28 house plan has a total built-up area of 2,408 sq ft across two storeys, on a 1,204 sq ft plot.
Yes, this 43x28 house plan is drawn for a west facing plot and is aligned with Vastu principles, with proper ventilation and natural light in every room.
The estimated construction cost for this 43x28 house plan is Rs 41 lakh to Rs 51 lakh for 2,408 sq ft of built-up area (Rs 1,700 to Rs 2,100 per sq ft, excluding land).
Yes, you can request up to two modifications to adjust room sizes or layout according to your preferences.
This house plan is designed for a plot 43 ft wide and 28 ft deep, a plot area of 1,204 sq ft.
4 bedroom house design
G+1 house design
g+1 elevation design
g+1 building elevation designs
2 storey house plan
double storey house elevation
Double Storey House Design
G+1 Floor Plan
Duplex 3d Elevation
Duplex 3d Elevation Design
g+1 house plan
Online Duplex 3D Elevation
Online Modern Duplex Floor PLan
Modern Duplex 3D Elevation
Residential Duplex 3D Elevation
Read More Read Less
Happy Customer
In-House Team
Cities Covered
Project Traceability
This Floor plan can be modified as per requirement for change in space elements like doors, windows and Room size etc taking into consideration technical aspects.
Detail drawings can be purchased Like Door- Window, Staircase, Structure, Electrical & Plumbing etc for which is mandatory for any construction to be followed onsite
CAD file of floor plan can be purchased with complete dimension and furniture layout, which can be modified by any Engineer or Architect for further changes
| Item | From | To |
|---|---|---|
| Mason (मिस्त्री) | ₹ 107975 | ₹ 142527 |
| Shuttering Carpenter | ₹ 72932 | ₹ 96280 |
| Painter | ₹ 7131 | ₹ 9414 |
| Labour | ₹ 204967 | ₹ 1270556 |
| Blacksmith | ₹ 19955 | ₹ 26341 |
| Total | ₹ 00000 | ₹ 00000 |
| Item | From | To |
|---|---|---|
| Earth Work & Excavation | ₹ 22800 | ₹ 28956 |
| Cement Bags | ₹ 133153 | ₹ 152328 |
| Sands | ₹ 231623 | ₹ 280264 |
| Aggregates/Gravels | ₹ 7118 | ₹ 122663 |
| Steel | ₹ 131851 | ₹ 159539 |
| Paints | ₹ 69000 | ₹ 97704 |
| Flooring | ₹ 94875 | ₹ 142313 |
| Granite | ₹ 92000 | ₹ 165600 |
| Glazed tiles | ₹ 57600 | ₹ 97344 |
| Doors | ₹ 346950 | ₹ 487118 |
| Plumbing | ₹ 110857 | ₹ 152429 |
| Electrical | ₹ 94875 | ₹ 123148 |
| Total | ₹ 00000 | ₹ 00000 |
Copyrights © 2026 makemyhouse.com, Mason's Mark Pvt. Ltd.
Venture All Rights Reserved.
Design & Developed by HUMUJ Technology and Consulting.
Click here to consult with us